If you put two or three quotes for paving, a terrace or a garden side by side, you usually end up asking why the prices are so far apart. The answer is almost never in the total, but in the individual items. Here is what we would look at in a quote if we were on the other side of the table.
How big is the area, really?
The quote should start with measurements: square metres for surfaces, linear metres for edges and fences, cubic metres for excavation. If it only says "build terrace", it is hard to say later what was agreed. Two quotes often differ widely simply because one calculates with 30 and the other with 36 square metres. A measurement on site removes that puzzle. If in doubt, ask who measured and how.
What happens to the old surface?
Before something new is built, something often has to go: the old paving, a concrete foundation, roots, surplus soil. Excavation, removal and disposal are among the items where quotes vary most, because how much material comes up is only visible on site. If the item is missing altogether, ask. Either it is included, or it appears later as an extra charge.
Base layers and surface
The base carries everything above it. The frost protection layer, load-bearing layer and bedding decide whether a surface is still level in five years. What such a structure looks like is described in the article Paving base: structure and compaction. A quote should show layer thicknesses and the type of material. The bare word "base" says little.
For the surface itself, type, format, colour and quality count. Many price differences simply come from comparing different products. If it only says "grey concrete paving", ask for the manufacturer or range.
Laying, joints, edges
The work includes laying, cutting, jointing and compacting. Edging, steps and the connection to the house or driveway are separate services. Check whether they are included or only the area in the middle. Missing edge stones are among the most common reasons for additional charges.
Where does the water go?
Slope, channels, drains or a drainage system should be stated in the quote, or explicitly not. Both are fine as long as it is clear. When drainage is really necessary is explained in the article Garden drainage: when you need it.
Travel, schedule, payment
There is usually also travel, site setup and VAT, as well as a period for start and duration. Pay attention to whether it is a fixed price or charged by effort. Payment terms and warranty belong in writing in the quote. Questions that help with comparison are collected in the article Comparing garden construction quotes.
How to recognise a good quote
It states quantities, describes the work steps, separates materials from labour and has no large lump-sum items. It also says what is not included, for example extra effort if the ground turns out differently. How materials, wages and schedule move the price is covered in Garden construction prices 2027. If you are planning a whole new garden, you will find reference points in Laying out a new garden: what does it cost in Nuremberg?.
How we go about it
We look at the area, measure it and clarify access, ground and water drainage. Then you receive a quote in which labour and materials are listed separately and can be checked. You can find more about our services at Garden construction in Nuremberg.