Laying plaster in winter: This is only possible to a limited extent. When there is permanent frost and frozen ground, no substructure can be compacted properly, and a surface that lies on frozen ground settles in the spring. Read here what can still be done when there is frost, what should wait and how you can use the cold season for your spring appointment.
Every year in November the same question comes up: the driveway should be finished before winter really begins. Paving is robust, but it is delicate when laying. What matters is not the pavement itself, but everything that lies beneath it.
Why frost is the problem when laying
A paving surface consists of a base layer, a bed of gravel and stones. The base layer must be compacted in layers so that it does not give way later. Frozen material cannot be compacted because the ice keeps the grains apart. When the ground thaws in spring, the ice disappears, and with it the apparent solidity: the surface sags, the joints open, hollows form.
There is also the gravel bed. It should be loose and even so that the stones are at the exact height. If it is moist and freezes overnight, it clumps together and the stones can no longer be placed cleanly. Joint material must also be dry so that it trickles in and fills the joints.
What works and what doesn't in frost
Individual frosty nights with plus temperatures during the day are no problem if the ground is not frozen solid. Then a company can work with coverage and good planning. As soon as the ground remains below zero for days, the installation should stop. A company that agrees anyway usually accepts a risk that you will later bear.
Working with mortar or concrete, such as edging or foundations for walls, is also tricky in frost because the water in the material can freeze before it sets. Excavation is possible when the ground is not frozen, but when there is hard frost it becomes laborious and expensive.
Why winter is still the right time to plan
Winter is not a wasted time for paving work, but rather a time for preparation. In spring, good companies are often fully booked for weeks. Anyone who inquires in winter will usually receive a fixed appointment earlier and can decide in peace.
These steps make sense now:
- On-site inspection to ensure the area, gradient and access are determined
- Fixed price offer with clear positions for substructure, materials and disposal
- Selection of stone, color and laying pattern based on samples
- Arrange an appointment for spring as soon as the ground is open
You can find out more about planning in winter here:Planning a garden project in fall and winter
What you can do yourself by spring
An existing paved area needs little in winter, but the right thing. Remove leaves and dirt so that no moisture remains. For dulling when it is slippery, it is better to use grit or sand than road salt because salt can attack joints and the surface. If there are depressions or open joints, mark the areas with photos so that they can be specifically renovated in the spring.
We have described here how a paving surface must be constructed so that it can survive the frost:Paving substructure instructions
And how to care for the area after winter:Maintain paving and terrace: moss and joints